| Customization: | Available |
|---|---|
| Connector Type: | CCS2 |
| Installation: | Floor Type |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MIDA 120kW dual CCS2 DC charging station supports hotel parking facilities, with a separate 60kW option. Plan guest and visitor charging around parking duration, departure times and vehicle needs, while confirming payment options and electrical capacity.

| Parameter | MD-EU-120KW |
|---|---|
| Rated output | 120kW |
| Connector configuration | Dual CCS2 |
| DC voltage range | 200-1000V |
| AC input | 400Vac +/-10%, 3P+N+PE; 50/60Hz |
| Efficiency | Greater than 95% |
| Power factor | Greater than 0.99 |
| Protection and cooling | IP54; forced-air cooling |
| Display | 10.1-inch LCD |
| Networking | OCPP 1.6 / 2.0; 4G, Wi-Fi and Ethernet |
| Dimensions | 700 x 600 x 2000mm |
| Net weight | 380kg |
| Package dimensions | 750 x 650 x 2050mm |
| Gross weight | 400kg |
The quoted model is MD-EU-120KW. A separate 60kW option is available. Confirm vehicle compatibility, guest access requirements and final configuration before ordering.

Review how long guests and visitors normally park, the energy they need before departure and the hotel electrical capacity. Consider short visits separately from overnight stays. The 120kW DC charging station should fit the wider charging provision and expected demand. Use real parking patterns when deciding the number of charging bays.

Check the expected vehicle CCS2 inlets, voltage requirements and charging curves. Actual charging power can be lower than the cabinet rating and changes during a session. The 120kW rating is total cabinet output. Confirm the ordered dual-connector power allocation before estimating simultaneous charging times or preparing guest information.

Choose the authorization or payment functions required by the hotel and confirm what is included in the final order. OCPP backend support should be tested with the selected platform and required functions. Provide clear instructions for guests and define the staff assistance process. Confirm session records and any operator reporting requirements before commissioning.

Review inlet position, cable reach, walking routes and luggage handling areas. Keep charging leads clear of vehicle exits and maintain access for service and emergency response. A qualified installer should assess foundation requirements, earthing, protection and supply capacity. Verify network coverage at the floor-mounted DC charging station location.
No. Confirm CCS2 and voltage compatibility. Actual power depends on vehicle acceptance, battery temperature, state of charge and available site capacity.
No. 120kW is the total cabinet rating. Confirm the selected configuration power allocation when two vehicles charge simultaneously.
Choose the charging mix from guest energy needs, parking duration and site capacity. This DC station can form part of a wider parking plan; longer stays may suit a different charging provision.
Confirm the ordered payment configuration. POS, RFID and mobile access options depend on the selected equipment and backend integration. Agree the required guest workflow before commissioning.
Define charging bay access, guest instructions, staff assistance and maintenance responsibilities. Keep charging leads clear of walking routes, luggage handling and vehicle exits.
The MD-EU-120KW cabinet is 70 x 60 x 200cm and 380kg net. The package is 75 x 65 x 205cm and 400kg gross. Confirm separate dimensions and weight for the 60kW option.
Provide expected guest vehicle demand, parking duration, available electrical capacity and the proposed bay layout. Confirm simultaneous charging needs and required payment or authorization functions. The Italy case video shows a bus-depot installation as an application reference; it does not verify the rating or exact configuration of this listing.
Confirm warranty coverage, commissioning responsibilities, operator training and spare-parts arrangements before delivery. Provide the charger model, fault description and site network details when requesting technical support.