| Customization: | Available |
|---|---|
| Connector Type: | CCS2 |
| Installation: | Floor Type |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MIDA 120kW dual CCS2 DC charging station supports hospital visitor parking, with a separate 80kW option. Plan charging around visiting hours and parking duration, while confirming vehicle compatibility, access arrangements and available site capacity.

| Parameter | MD-EU-120KW |
|---|---|
| Rated output | 120kW |
| Connector configuration | Dual CCS2 |
| DC voltage range | 200-1000V |
| AC input | 400Vac +/-10%, 3P+N+PE; 50/60Hz |
| Efficiency | Greater than 95% |
| Power factor | Greater than 0.99 |
| Protection and cooling | IP54; forced-air cooling |
| Display | 10.1-inch LCD |
| Networking | OCPP 1.6 / 2.0; 4G, Wi-Fi and Ethernet |
| Dimensions | 700 x 600 x 2000mm |
| Net weight | 380kg |
| Package dimensions | 750 x 650 x 2050mm |
| Gross weight | 400kg |
The quoted model is MD-EU-120KW. A separate 80kW option is available. Confirm vehicle compatibility, visitor access requirements and final configuration before ordering.

Review visiting hours, appointment patterns and average parking duration to estimate charging demand. The 120kW DC charging station should fit the available electrical supply and expected vehicle mix. Consider staff and visitor needs separately when assigning bays. Review actual utilization after opening before deciding whether to expand the charging area.

Check CCS2 inlets, supported voltage and expected vehicle charging curves. Actual power changes with vehicle acceptance, battery temperature and state of charge. The 120kW rating is total cabinet output. Confirm the selected dual-connector power allocation before estimating charging times or describing the service to visitors.

Agree the payment or authorization functions required by the parking operator and identify the functions included in the order. Test the selected OCPP backend and visitor workflow before commissioning. Provide clear instructions for starting and stopping sessions, together with an operator support process. Coordinate parking time limits with charging arrangements.

Locate the floor-mounted DC charging station away from emergency access and patient drop-off routes. Check cable reach and keep leads clear of pedestrian paths. A qualified installer should assess foundations, earthing, electrical protection and supply capacity. Preserve cabinet ventilation and maintenance access, and check network coverage at the installation point.
No. Check CCS2 and voltage compatibility. Actual power depends on vehicle charging limits, battery conditions and available site capacity.
No. 120kW is total cabinet output. Confirm power allocation between the two CCS2 outlets for the selected configuration.
Estimate demand from visiting hours, parking duration and expected vehicle numbers, then check electrical capacity and the proposed bay layout. Review operating data before adding more chargers.
Confirm the ordered configuration. POS, RFID and mobile access options depend on the selected equipment and backend integration. Test the complete visitor workflow before opening.
Keep charging bays and cables clear of emergency access, patient drop-off routes and pedestrian paths. Preserve space for vehicle doors, maintenance and the agreed visitor support process.
MD-EU-120KW measures 70 x 60 x 200cm and weighs 380kg net. Its package measures 75 x 65 x 205cm and weighs 400kg gross. Confirm separate dimensions and weight for the 80kW option.
Provide the expected vehicle demand, parking duration, available electrical capacity and proposed bay layout. Confirm simultaneous charging requirements, payment options and operator support arrangements. The Italy case video shows a bus-depot installation as an application reference; it does not verify the rating or exact configuration of this listing.
Confirm warranty coverage, commissioning responsibilities, operator training and spare-parts arrangements before delivery. Provide the charger model, fault description and site network details when requesting technical support.